Mirror best supplier Polish Chromeplate Lamp Lighting Custom CNC Machining Turning Brass Stamping Parts

Mirror  best supplier Polish Chromeplate Lamp Lighting Custom CNC Machining Turning Brass Stamping Parts

focus in electricity transmission products,pto shaft, agricultural gearboxes , CATV items, mechanical seal, hydraulic and Pheumatic, and marketing merchandise.

 

Components

one. metal:Aluminum/Metal/Alloy metal/Stainless metal/Brass,copper,bronze etc.

2. plastic: Ab muscles,POM,PE,PP,PVC,Laptop,PMMA,Teflon,nylon and many others.

3. other folks: carbon fiber, glass,fiberglass, wooden, hard rubber etc.

Colour

Silver, Grey, Black ,Gold or as client’s requirement

Surface Roughness

Ra0.4 ( without sprucing or grinding)

Logo Approach

laser engraving, CNC engraving, screen-pOur firm is located in XiHu HangZhou Zhejiang Province. Trinting and many others.

Floor Finish 

Anodize sprucing zinc/nickel/chrome/gold plating, sand blasting, ect.

Tolerance 

+/- .01–.05mm / can also be tailored

Certification

ISO9001 SEPG

Processing equipments

CNC machining centre,NC lathe, Grinding device, Automated lathe device, Standard lathe machine,Milling machine,Drilling machine,EDM,Wire-reducing equipment,CNC bending machine and many others

Tests equipment

Coordinate measuring device,Image measuring instrument,Caliper and many others

Software

Precision Health-related Instruments/Digital/ Industrial// Automation / motorcycle/3D printer

Market 
 
Janpan,Korea, Europe,Usa,CA.AU,Southeast Asia….

Support

OEM,ODM or as client’s requirement

Packaging & Delivery
Packaging Particulars
1. internal packaging: plastic wrap, bubble bag, PE foam, EPE cotton,PP bag and many others. 
2. outer packaging: carton box, wood circumstance, plate and many others. 
3. as for every customers’ prerequisite
Port
xiamen, or as client’s prerequisite
Lead Time :

Amount(Parts) 1 – 20 21 – 100 a hundred and one – 1000 >1000
Est. Time(times) 5 10 twenty five To be negotiated

Trade Conditions FOB, CIF, EXW
MOQ 1Pcs
Port xiamen, or as client’s need
Shipping By air  (DHL,UPS,Fedex,EMS and so on.),By Sea,Specific…
Payment Approach T/T(bank transfer),L/C,paypal,western union, moneygram,escrow, income and many others
Payment Terms 50% just before manufacturing, 50% ahead of supply
Packing inner box,a lot of boxes/grasp carton or as customer’s necessity
Supply time  5-7days for Alanple time,5-twenty five times for creation