Roller best supplier chain sprocket Plate wheel with black oxide Manufacturer

Roller  best supplier chain sprocket Plate wheel with black oxide Manufacturer

We provide OEM provider.

Overview

Fast Particulars

Applicable Industries:

Accommodations, Garment Retailers, Building Material Outlets, Manufacturing Plant, Machinery Repair Shops, Foodstuff & Beverage Factory, Farms, Restaurant, Residence Use, Retail, Foodstuff Shop, Printing Retailers, Development works , Strength & Mining, Foodstuff & Beverage Shops, Advertising and marketing Company

Material:

Metal

Common:

ISO

Location of Origin:Zhejiang, China
Brand Name:

OEM

Item identify:

Roller chain sprocket Plate wheel with black oxide Manufacturer

Shade:

Black

Floor therapy:

Black Oxide

Packing:

Plywood Box

Certification:

ISO9001

OEM:

Support

Source Potential

Supply Potential:
10000000000000 Unit/Models for each Month

Packaging & Shipping

Packaging Information
plastic bag+plywood box+according to customers’ demands
Port
HangZhou Or Ningbo
Photo Case in point:

Lead Time
:
Quantity(Models) one – one thousand >1000
Est. Time(times) forty five To be negotiated

On-line Customization

 

 

 

1 Substance

 

C45(one.0503),SS304(1.4517),SS316(one.4541),Q235(S235JR),Q345,C20,40Cr,POM,PA6,Aluminum,GG25, Qt900-2,qt600-three,qt800-2,qt500-seven,9cr18mov,qt400-15,20CRMNTI,42CRMO,Brass(Copper)

—SPROCKETS/GEARS/CNC MACHINING Areas/BUSHINGS/SHAFTS/PULLEYS/COUPLINGS
40Cr,40MN,45MN,65Mn,SS304(one.4517),Rubber—Chains

 

2 Tailored

Drawing as regular or authorized by client prior to production

three Regular

ANSI ,ASA,DIN ,JIS ,BS, ( SATI, CHIARAVALLI, BEA,MARTIN, BROWNING,KANA)

4 Warmth Treatment method

Harden teeth, Carburizing and Quenching,Fuel Nitriding

five Suface Therapy

 

Black Oxide, Black phosphating, Nickel plating,Chromium plating,Copper Passivation

6

 

Approach

 

Forging( casting)—lathe- enamel shaping—finishing—oil washing—Packing ,produced by CNC machine

seven Inspection

 

All products are checked and tested thoroughly during each working method and right after the item is last but not least manufactured to ensure that the best quality solution enter into the market.

 

8 Operate

Durable, bad condition Resistance

nine Shipping Time In inventory or about 30-fifty Days times